previous arrow
next arrow
Slider
PROJECTS  |  AMAZON DISTRIBUTION CENTER

AMAZON DISTRIBUTION CENTER

line

The UPS Sandy Creek Hub is a ± 1.1 million square foot facility with multiple accessory building to service it on the complex which includes two guardhouses, two wash tunnels, a full automotive service shop, a pedestrian bridge, and a retail center. Inside the main hub is a complex distribution of conveyor systems that run through the building’s core, corridor and fingers. It has a 3-story main office with an observation deck and is accompanied by nineteen other office complexes scattered through the hub. This hub can service semi-trailers, box trucks (inside), and air containers in the designated pit. The building also contains a full cafeteria for its employees.

Design details include:
• 3-story office
• Floor to ceiling brick tile in the main entry.
• Barrel ceiling in the lobby.
• Dedicated control room.
• Multi-functional training rooms.
• Pedestrian bridge

AMAZON DISTRIBUTION CENTER
LOCATION
Daytona, Florida
SIZE
1,100,000 SF
COST
Confidential
MARKET

Industrial

SERVICE

Architecture, Interiors

Get In Touch With Us

Contact Us  arrow